ADDC PERMANENT CONNECTION REQUIEST – DOCUMENTS REQUIRED
Approved LV drawing case ID Electrical room Pictures Electrical Room Readiness Form (Content attached)
ADDC PERMANENT CONNECTION REQUIEST – DOCUMENTS REQUIRED Read More »
Approved LV drawing case ID Electrical room Pictures Electrical Room Readiness Form (Content attached)
ADDC PERMANENT CONNECTION REQUIEST – DOCUMENTS REQUIRED Read More »
All type of Electrical Load Premise area (SqMtr) Owners Documents Updated Site Plan (Valid 6 Month) Single Line diagram Load Schedule GROUND Floor Electrical ROOM Layout Operational Method (Where required) Copy of PROPOSED CIVIL WORKS LAYOUT
ADDC LDN APPROVAL REQUEST – DOCUMENTS REQUIRED Read More »
Meps ID Company trade licence or Land lord Emirates ID ADM Site plan(Valid for 6 months) Owners Documents (Emirates ID or Letter from Client if ts Public sector) MEPS Approved site Layout Contract AGREEMENT Approved Municipality Civil Layout Meter Schedule for KW/hr Single line diagram (A1-A0 Size) Power Layout Lighting Layout Load Schedule Cable route
ADDC DRAWING APPROVAL – DOCUMENTS REQUIRED Read More »
Approved LV drawing case ID Updated Site Plan Electrical Installation Certificate (ATTACHED) Inspection Report as Per Electricity Wiring Regulation (ATTACHED) Electrical Installation Testing Report (ATTACHED) Supply Certificate and Approval Letter For LV Switch Gears
ADDC INTERNAL WIRING INSPECTION REQUIEST – DOCUMENTS REQUIRED Read More »